 |
 |
| - |
Max vertical reach 24m. |
| - |
Unfolding height: only 5.15m. |
| - |
Mixed 4 section ZR folding: the best solution for tunneling
works and in low sheds. |
| - |
Complete opening of the boom and complete horizontal extension
of all sections, in restricted heights. |
| - |
New design built using special high-resistant steels. |
| - |
Self-supporting unit with torsional rigid frame. |
| - |
Possibility to pump very close in front of the cabin. |
| - |
Advantageous assembling on a 2 axle standard chassis - wheelbase
4500 mm. |
| - |
Front stabilisation "X" style: quick and safe pump
placement in narrow areas. |
| - |
Cifa genuine pumping unit Series 8 up to 100m3h. |
| - |
Quiet pumping even with high performances: smooth, continuos
and uninterrupted concrete flow. |
| - |
Remote concrete flow rate regulator. |
| - |
High suction efficiency, thanks to direct communication between
hopper and concrete cylinders. |
| - |
Rapid valve exchange with foolproof positioning. |
| - |
Highly efficient seal between plate and ring thanks to Cifa's
Self-Compensating System. |
| |
|